HURRICANE IDA DAMAGE REPAIRS TO BESS HARVEY STADIUM

Replacement of storm damaged items at the existing football field, including bleachers and a press box on a pile-supported concrete slab, 75-foot high pole field lighting, and a new restroom building. It is understood that the bleachers on the visitors side will be supported by a slab on grade foundation system.
Specifications (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2023-01 A Specifications (1) 8.3 MB