HURRICANE IDA DAMAGE REPAIRS TO BESS HARVEY STADIUM
Replacement of storm damaged items at the existing football field, including bleachers and a press box on a pile-supported concrete slab, 75-foot high pole field lighting, and a new restroom building. It is understood that the bleachers on the visitors side will be supported by a slab on grade foundation system.
Specifications
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| 2023-01 A Specifications (1) | 8.3 MB |

