EAST BANK CUSTOMER CARE BUILDING UPGRADES
Refurbish of Interior
Status
Accepting Bids
Prebid Date | 5/21/25 9:00am |
Bid Date | 6/5/25 2:00pm |
Location
3400 CANAL ST, NEW ORLEANS, LA 70119
Request for Information #10
1. Yes, all contractors and subcontractors must be listed and approved in Avetta.
2. Yes, all contractors and subcontractors must have completed the Entergy Safety Training provided at the top of the Pre-Bid Meeting Agenda. Link to Safety Portal: External access (subs) to Safety Portal https://app.smartsheet.com/b/publish?EQBCT=00667dc18b09453facd78df3e073409b 3. Yes, all crew members must have OSHA 10 certification; the Superintendent is required to have OSHA 30. Contractor & Subcontractors are Considered Level 1 Contractors - A summary list is included in the Safety Portal.