Harvey Volunteeer Fire Department Maintenance Facility
1.Construction of a New Fire Department Maintenance Facility with all Interior and Exterior appurtenances, and Site Amenities as indicated on the Drawings and Specifications. 2.Disposal of the existing Soil Overburden to locations as indicated in the Drawings and Specifications and as directed by the Owner. 3.Construction of a LADOTD compliant Street and appurtenances. 4.Provide Rough-In’s for Owner’s Security Systems as indicated on Drawings and Specifications.
Plan Holders
Date | Company | Contact |
2/5/25 1:21 pm |
Apex Waterproofing of Louisiana LLC
1508 Edwards Avenue Suite MM Harahan, LA 70123 |
Andrew Harper
Tel: (504) 309-4813
Fax: (504) 309-4918
|
2/6/25 9:09 am |
Curtis Stout Inc.
201 Evans Rd Harahan, LA 70123 |
Kyle Grazioli
Tel: 504-818-1848
Fax: 504-818-1655
|
1/31/25 9:33 am |
DCN
300 American Metro Blvd. 185 Hamilton, NJ 08619 |
Damarcus Noble
Tel: 8443263826
|
1/31/25 2:20 pm |
Premium Drywall Plus
81694 LA-21 Bush, LA 70431 |
Premium Drywall Plus
Tel: 9858860034
|
1/29/25 1:57 pm |
SESCO Lighting
3340 Severn Ave Suite 215 Metairie, LA 70002 |
Chau Ly
Quotations Specialist
Tel: 504-326-1410
|
1/30/25 10:44 am |
V-Plan
209, 918 Dundas Street East Mississauga, ON L4Y4H9 |
Vitor Canesso
Tel: 7792092909
|
1/31/25 5:11 pm |
dodge
201 S. Washington St. Rocky Mount, NC 27801 |
Sanjeevi n
construction
Tel: 9999999999
Fax: 123 456-7890
|